Thanks for the vote of confidence Paul (and others). The vision is that from a position of having the rolling chassis in as restored a state as required, the basic kit should take no more than 2 hours to have the frame with integral floors fitted and the body shell bonded and bolted on. This should enable a completed build to be at least MoT-able within a month of weekends.
|