Paul L Not sure at the moment so i will be adding a frame to the rear just in case and also adding extra box section to strengthen the frame in certain areas plus i will need to work out what to do for the steering column.
Today i finished the prop shaft tunnel.
IMG_4552.jpg IMG_4551.jpg
I used a length of 5'' mild steel pipe, split it in two with a plasma cutter, cut the two sides from 1.5mm steel plate and welded into place. The top cut out profile was cut and a card board template used to transfer onto steel plate which was profiled out and welded into place, ground up and job done.
IMG_4550.jpg
Tunnel laid into place which will look good once coated in a finish. Just need to drill various holes and add the cable entry pipe which i will do once i have manufactured the hand brake handle mount from ally, hopefully have that finished this week provided machine is free.
Until next time take care.