View Single Post
  #7  
Old 8th March 2018, 01:32
Yorkshireman Yorkshireman is offline
Member
 
Join Date: Nov 2017
Location: Pudsey Leeds West Yorkshire
Posts: 86
Yorkshireman is on a distinguished road
Default

So After a 2 good days with the grinder and more than 20 trial fits of the frame and the body, I was happy that the grinding was complete for now. I now know the next job lists to do before the final frame fitting and body fitting.
Trim the arches back
repair the floor and bolt down to the frame.
Fit and pipe up the spitfire fuel tank I now know where i will place it on the frame work.
make the adjustments to the frame to hold the spare wheel
paint and protect the floor in all the hard to reach places.
Luckly I have space now in the garage to work on the sammio as from the last photo the snow came down.
Attached Images
File Type: jpg 20180227_143350.jpg (97.3 KB, 43 views)
File Type: jpg 20180227_143416.jpg (97.2 KB, 32 views)
File Type: jpg 20180227_143408.jpg (97.3 KB, 31 views)
File Type: jpg 20180227_143909.jpg (97.7 KB, 32 views)
File Type: jpg 20180228_100907.jpg (94.6 KB, 39 views)
Reply With Quote