View Single Post
  #59  
Old 27th July 2009, 19:33
limpabit's Avatar
limpabit limpabit is offline
Senior Member
Enthusiast
 
Join Date: Oct 2004
Location: Basildon, Essex
Posts: 1,800
limpabit is on a distinguished road
Default

Thought I would give some update as it's been a little while.

Boost hoses and chargecooler fitted. Hoses not jubilee clipped yet as I need to complete the water hoses for the chargecooler (waiting for rad)


Polished inlet and new expansion bottle. Together with shiney chargecooler filler.


Oil cooler fitted. Electrics looks worse than it appears. Just lamber to solder in (but can't do this until exhaust is done. Gentral clipping on wiring to do for now. When mapped and all wiring tested, the will go in conduit. Just in case I've missed something!


Things to do.
Accelerator to be sent off (too short)
Jublee clip every thing that is left (a few water pipes and boost pipes)
Fit slave cylinder and battery tray.
Fit driveshafts back together
Fill cooling system and check for leaks. Same for oil system.
Fill engine up to temp and see if Rover gauge displays correct coolant temp!

This I hope to complete withing the next 2 weeks. Maybe not accelerator cable (sending it off to get done).

Hopefully off at the end of September to get exhaust made.
Reply With Quote