Next, it was time to weld it all together.
IMG_1681.jpg
Finished product welded and primed. I will weld on a couple of bars below the plate to rest on the floor and to provide the area to bond the lower part of the fibreglass bulkhead to it.
I will also weld square bar above the pedal box onto the frame to brace it if necessary, to prevent it moving upwards when the pedals are pressed. I will first bond the fibreglass bulkhead to the frame and the floor to check if this is needed.
IMG_1689.jpg
IMG_1693.jpg
I have welded some tubing on the opposite side too, to add a lowered battery compartment....
IMG_1691.jpg
.....it looked a bit small, so I modified it and made it wider and longer, so there is enough space for the battery.
IMG_1697.jpg