View Single Post
  #969  
Old 2nd June 2014, 14:38
Paul L's Avatar
Paul L Paul L is offline
Senior Member
 
Join Date: Feb 2012
Location: Wembley, London
Posts: 5,056
Paul L is on a distinguished road
Default

More Fibreglass Work:
Next I turned my attention to the other "water trap" which is a bit deeper than the other side.
( Due to the amount of rusty metal I had cut away from the other side. )



But if you followed the edge beneath my fingers around you would find this.



Which I needed to add some mesh to in order to build back up a nice edge.



Note:
The arrow is just to remind me where I patched a small hole on the other side.
( It is so small I actually missed it yesterday when I was adding filler. )

Then it was time to cut up some more foam and stuff it into the gap.



Before covering that in fibreglass matting.



I also started to repair the missing edge.



You will see that there is now some filler where the arrow is pointing.

I also added filler to the first foam covered area.



And the inside of one of the edges I'd repaired.



I also had to re-do one of the patches where my grinder "dug in" when I giving it a "light skim".



At this point, other chores went against me, so the cover went on and I left things to dry / set.

With a bit of luck I might be able to do a bit more this evening.

Cheers, Paul.
Reply With Quote