More Fibreglass Work:
Next I turned my attention to the other "water trap" which is a bit deeper than the other side.
( Due to the amount of rusty metal I had cut away from the other side. )
But if you followed the edge beneath my fingers around you would find this.
Which I needed to add some mesh to in order to build back up a nice edge.
Note:
The arrow is just to remind me where I patched a small hole on the other side.
( It is so small I actually missed it yesterday when I was adding filler.
)
Then it was time to cut up some more foam and stuff it into the gap.
Before covering that in fibreglass matting.
I also started to repair the missing edge.
You will see that there is now some filler where the arrow is pointing.
I also added filler to the first foam covered area.
And the inside of one of the edges I'd repaired.
I also had to re-do one of the patches where my grinder "dug in" when I giving it a "light skim".
At this point, other chores went against me, so the cover went on and I left things to dry / set.
With a bit of luck I might be able to do a bit more this evening.
Cheers, Paul.