View Single Post
  #177  
Old 17th November 2018, 15:03
Paul L's Avatar
Paul L Paul L is offline
Senior Member
 
Join Date: Feb 2012
Location: Wembley, London
Posts: 5,056
Paul L is on a distinguished road
Default

MOT - Number Three
I was hoping to prep the car yesterday (Friday), but despite having some spare time available, it was drizzle all day.

So I had to start work before 8am this morning and there was a list of jobs…

First up was reconnecting the over drive switch to the gear lever.
(The Haynes' manual's 'reassemble in reverse order' wasn't exactly helpful. )

Thankfully, I quickly worked out that to get some play in the wires here...



I needed to cut this cable tie at the bottom of the gear lever here.



That allowed enough slack to pull the wires through.



And connect the switch.



I could then pull the wires back through, 'click' the switch back into place and use a new cable tie.



Job done.

Although making a leather gaitor for the gear level is clearly still on the 'To Do' list.

Next it was the checking/torquing the wheel nuts.



All but two nuts 'clicked' first time and the two that didn't needed less that half a turn.

I also checked/adjusted the tyre pressures and again they were all close.

Not a great photos, but all the 'dead bugs' needed to cleaned off the aero screens.



I also swept and hoovered all the leaves, etc. from inside the front footwells.



Which reminds me, at some point I need to prune the 'garage' wall.



Then the car was jacked up, and left on blocks, on the driver's side.



So I could crawl underneath.



End of Part 1…
Reply With Quote