And the lowered floorpans have been fabricated and I've started on the rest of the bulkhead!
Lots of bonding (with Tiger Seal) and also riveting together have made them very strong and given me much needed foot room!
I've also now altered and welded on the changed steering column mounts so that i can finish fitting the steering and cutting the front bulkhead panel on the drivers side.
Along with finishing the steering i'm also going to fabricate into the bulkhead a battery box. As if i didn't have enough drilling and pop-riveting to do as it stands!!