View Single Post
  #126  
Old 11th September 2017, 07:21
Mick O'Malley Mick O'Malley is offline
Senior Member
 
Join Date: Nov 2012
Posts: 845
Mick O'Malley is on a distinguished road
Default Not a lot............

Quote:
Originally Posted by Jaguartvr View Post
Any updates on the Moss?
Not a huge deal of progress made over the summer months. There was a long wait for my latest batch of welding jobs to be done by my contact of almost 40 years as he has had staffing problems at a very busy time: his real work takes precedence! I've been driving the A352 'D' quite a bit and have had a holiday so the months seem to have flown by.

Anyway, at last my extended gear change remote, hand brake lever mounting plate and multiplier lever mounting bracket are ready for installation. I've now realised that final bolting of the body to the chassis will be almost the last job of all as being able to pop it off facilitates so many of the building tasks.

I've run the battery cables from the 'boot', through the transmission tunnel, to the starter solenoid and cranking motor mounting bolt respectively, with an isolation switch in the +ve. Working out how to crimp the terminal eyes caused a bit of head scratching until I hit on using my water pump pliers with inch box over the arms to multiply the effort. This worked a treat .

Careful measuring of the limited space for the handbrake effort multiplier lever showed that it could be used, slightly modified, as the manufacturer intended, rather than by my previous idea. The problem of shortening the primary cable was overcome by substituting a length of angle cut from some scrap box section. I've angled the mounting hole in the top of the tunnel to align said rod with the business end of the multiplier lever. As soon as a dry day comes I'll bolt the handbrake bits and gear lever in position with the body off. End of part one.
Reply With Quote