Aluminium tunnel panels fitted in place today , I braced the backs with 20mm aluminium box to stiffen then up ...
Ray popped down and we ran through the gearshift gate plans and lower dash layout ...I braced the rear of the lower dash panel and fitted up the dash after he left and made a template for the shift gate ..dropped it to my engineer mate on the way home ..