Lots of work going on
]Hi guys, been a cack load of work going on over the last few weeks and I am knackered!
The bits in work:
- Bumpers filled/sprayed and ready to vinyl wrap this week
- Exhaust resonators (ala the 275) in work but initial manufacture done - see pic (They will eventually be polished tips/redband and black painted as per the 275 original car - Maybe with ANSA badges) See capture pic for what trying to achieve.
- Exhaust hangers (again as per the capture pic - Fezza originals ordered from Germany on on their way) the other pic shows I have strengthened where the exhaust hangers will go - Where the rivets are behind the panel is T6-alclad aluminium plate bonded and riveted in so will have good structure to hang off.
- Alloys and rubber all sorted - 205/65/15 with ET20 offset - looks good possibly not to have to widen the track after all at back end.
- Glassing virtually finished on back end - trialling final fits tomorrow
- Blocked off rear light areas and "splash shields" manufactured from fglass and fitted.
- Flowcoat inside rear end started today.
- Sills nearly completed, end caps done on trims, getting retention bolts welding done on this weekend and trial fits hopefully next week.
- Door window seals fitted
Flickr for some reason not working so a few photos added as per below.
Cheers.
Last edited by Welshkiwi; 20th July 2019 at 04:41..
|