She did indeed! (athough she forgot to send the build stands up!)
The two guys in the pics are my mates Iain and Nathan - they came to help off load and
piss about help.
Don't think I need any other bits. It'll be OK like this....
Once we had got the chassis inside and on some stands, we wiped it down (it had come up the motor way without a cover) to get rid of the road dirt.
We then got down to getting the first thing bolted in:
That was the first attempt... As you can see, we made the mistake of bolting in the diff with the top web still in place.
It wasn't really apparent from the build pics on the disc that came with the manual - It wasn't until we looked at Martin's site that we saw the 'things to remember' page. So off it came, out came mister angle grinder.
A bit of paint and voila - first thing bolted on.
We aslo managed to get the bushes set into the lower front wishbones (sorry, no pics yet), but by then we where all getting very hungry (and thirsty) - so we called it a day and decamped to the pub.
I'm very chuffed so far - bolting the first thing into the chassis was a huge milestone.
BTW - what's the Hugh [sic] Washer for? I haven't used it on the Diff mount, as it's too big to go on the outside of the diff mount, and it'd just rattle around on the inside.