View Single Post
  #2046  
Old 17th September 2015, 16:34
Paul L's Avatar
Paul L Paul L is offline
Senior Member
 
Join Date: Feb 2012
Location: Wembley, London
Posts: 5,056
Paul L is on a distinguished road
Default

Thursday - Part 2:
I finally got around to putting some thick cardboard in front of my new radiator.



Hopefully this will help prevent any accidental damage during construction.

Even though I will not be connecting this up just yet, I did fit the cut off switch.





The restricted access at the back made this much harder to do than it should have been.

For now, I've just put the switch cover in place until the wooden dash board section gets fitted.



I made a small funnel to get some 3-in-1 oil all the way through the throttle cable.



Then the cable fitted through the bulkhead and connected to the accelerator pedal.



I was then able to fit the new pivot pin parts at the other end.
( Replacing the original parts that were lost/missing. )



Overall, lots of small jobs, but it does feel like I am finally working my way towards the "Moon Buggy" stage.

So until next time, take care, Paul.
Reply With Quote