Just to show that progress is ongoing.........
The rear bulkhead and upper-face of the transmission tunnel are cut and fitted.
Front bulkhead is next, and then I can drop the frame onto the floor and chassis......softly, softly, catchy monkey.
No. 1......
No. 2......